Upgrading Process Designer from 8.3.1 or 8.3.02
To upgrade to 8.3.03 from 8.3.1 or 8.3.02, you use the the same steps as with a new installation.
Note
In earlier versions of Process Designer, you could install all process designer modifications made to the AR Application server on the overlay layer (Best Practice Mode).
For 8.3.03, you must perform the installation on the base layer. The option to install in Best Practice Mode has been removed.
If the existing installation was installed on the overlay layer, all custom objects are moved to the base layer before the install starts. Following the install, you must manually reconcile all overlay objects.
To upgrade from Process Designer 8.3.02
If you are upgrading from version 8.3.02 of Process Designer:
- Run the Process Designer server installation.
- When prompted by the installer, stop the AR System service.
This allows an update to the ar.conf and pluginsvr_config.xml files, removing changes made in the previous installation. Follow the prompts to stop and then start the service.Note
Wait until the service has restarted before continuing.
- Re-start your AR System service
Comments
Log in or register to comment.