Smart IT notification events
Typically, desktop clients receive email notifications and mobile clients receive push notifications. The notifications arrive based on certain events as described in this section. Details of the event can be seen by clicking the link in the email on a desktop computer, or by tapping the icon on a mobile device.
Notifications for mobile clients can be localized based on the language specified in the People record. The notification locale must be set in Smart IT to receive the notification in preferred locale.
Related topic
The following tables describe notification events:
Incident Management notification events
The following table describes Incident Management notification events:
Incident Management notification events
Event | Message tag | Filter | Description |
---|---|---|---|
Assignment | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Assignee when the assignment changes and the Incident is not resolved. |
Assignment | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Assigned Group when the assignment changes and the Incident is not resolved. |
OLA Resolution Escalated Notification | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Incident Assigned Group when the Incident is escalated for an OLA resolution. |
Ownership Assignment | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Assigned Owner when Ownership of the Incident is set. |
Ownership Assignment | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Assigned Owner Group when Ownership Group of the Incident is set. |
Resolution | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Assignee when a duplicate Incident is resolved by an original Incident. |
Resolution | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Assignee Group when a duplicate Incident is resolved by an original Incident. |
Resolution | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Incident Owner Group when a duplicate Incident is resolved by an original Incident |
Resolution | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Incident Owner Group when an Incident is resolved. |
Resolution | SMARTIT-HPD-INC- | HPD:INC:NTOwner_ | Notifies the Incident Owner when an duplicate Incident is resolved by an original Incident. |
Resolution | SMARTIT-HPD-INC- | HPD:INC: | Notifies the Incident Owner when an Incident is resolved. |
Problem Management notification events
The following table describes Problem Management notification events:
Problem Management notification events
Event | Message tag | Filter | Description |
---|---|---|---|
Unavailability Restored | SMARTIT-AST-PBI- | INT:ASTHPD:AAA: | Notifies the Problem Investigation Assignee that the related CI Unavailability has been restored. |
Unavailability Restored | SMARTIT-AST-PBI- | INT:ASTPBM: | Notifies the Problem Investigation Problem Coordinator that the related CI Unavailability has been restored. |
Problem Assignment | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Assigned Group that the Problem Investigation assignment information has changed and there is no individual assignee. |
Problem Assignment | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Assignee that the Problem Investigation assignment information has changed. |
Problem Cancelled | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Requester that the Problem Investigation has been cancelled by the Problem Coordinator. |
Problem Completed | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Problem Coordinator Group that the Problem Investigation has been completed and there is no individual Problem Coordinator. |
Problem Completed | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Problem Coordinator that the Problem Investigation has been completed. |
Problem Completed | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Requester that the Problem Investigation has been completed. |
Problem Coordinator Assignment | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Problem Coordinator that the Problem Coordinator assignment information has changed. |
Problem Coordinator Assignment | SMARTIT-PBM-PBI- | PBM:PBI: | Notifies the Problem Coordinator Group that the Problem Coordinator assignment information has changed and there is no individual assignee. |
Change Completed | SMARTIT-PBM-PAS- | PBM:PAS: | Notifies the Problem Assignee that a change request related to the Problem Investigation has been completed. |
Change Completed | SMARTIT-PBM-PAS- | PBM:PAS: | Notifies Problem Coordinator that an related to the Problem Investigation has been completed. |
Known Error Assignment | SMARTIT-PBM-PKE- | PBM:PKE: | Notifies the Assigned Group that the Known Error assignment information has changed and there is no individual assignee. |
Known Error Assignment | SMARTIT-PBM-PKE- | PBM:PKE: | Notifies the Assignee that the Known Error assignment information has changed. |
Known Error Manager Assignment | SMARTIT-PBM-PKE- | PBM:PKE: | Notifies the Problem Coordinator that the Known Error Problem Coordinator assignment information has changed. |
Known Error Manager Assignment | SMARTIT-PBM-PKE-ProblemManager | PBM:PKE: | Notifies the Problem Coordinator that the Known Error Problem Coordinator assignment information has changed and there is no individual assignee. |
Change Management notification events
The following table describes Change Management notification events:
Change Management notification events
Event | Message tag | Filter | Description |
---|---|---|---|
Change Coordinator Assignment | SMARTIT-CHG-CRQ- | CHG:CRQ:ChgAssignee-ReassignSetTag_330_Submit | Notifies change coordinator that a change has been reassigned to him. |
Implementer Assignment | SMARTIT-CHG-CRQ- | CHG:CRQ:ChgImplementer | Notifies change implementer that a change has been reassigned to him. |
Change Manager Assignment | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change manager that a change has been reassigned to him. |
Change Coordinator Planning | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusPIPAccepted | Notifies change coordinator group that the change request is set to the Planning In Progress status. |
Change Coordinator Latent Completion | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change coordinator that a change has been completed as a latent change. |
Change Manager Latent Completion | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change manager that a change has been completed as a latent change. |
Change Manager Re-scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change manager group of change manager assignment for a rescheduled change request. |
Change Manager Re-scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change manager of change manager assignment for a rescheduled change request. |
Change Coordinator Re-scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ:ReSchRFCChg | Notifies change coordinator group of assignment for a rescheduled change request. |
Change Coordinator Scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ:ReSchRFCChg | Notifies the change coordinator of assignment for a rescheduled change request. |
Approval | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies the assignee that the change has been rejected during an approval phase. |
Approval | SMARTIT-CHG-APR-ApprovalNTForIndividual | AP:Notify-000000000000041 | Notifies the approver that the change request requires an approval. |
Approval | SMARTIT-CHG-CRQ- | CHG:CRQ:NotifyOnRejectApproval-CMGrp | Notifies the assignee group that the change has been rejected during an approval phase. |
Change Coordinator Completion | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusCompleted_ | Notification to change coordinator group that the change request is set to the Completed status. |
Change Coordinator Completion | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusCompleted | Notification to change coordinator that the change request is set to the Completed status and the change request status reason is Final Review Complete. |
Change Manager Completion | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusCompleted_ | Notification to change manager that the change request is set to the Completed status. |
Change Manager Completion | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusCompleted | Notification to change manager that the change request is set to the Completed status and the change request status reason is Final Review Complete. |
Change Coordinator Pre-planning | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusRFCCAGrpSetTag_ | Notifies change coordinator group that the change request is set to the Request for Change status. |
Change Coordinator Pre-planning | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusRFCCASetTag_ | Notifies change coordinator that the change request is set to the Request for Change status. |
Change Manager Pre-planning | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusRFC_ | Notifies change manager group that the change request is set to the Request for Change status. |
Change Manager Pre-planning | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusRFCCM | Notifies change manager that a change request is set to the Request for Change status. |
Change Manager Planning | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change manager group that the change request is set to the Planning in Progress status. |
Change Manager Planning | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change manager that the change request is set to the Planning in Progress stage. |
Change Coordinator Planning | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change coordinator group that the change request is set to the Planning in Progress status. |
Change Coordinator Assignment | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change coordinator that the change request is set to the Planning in Progress status. |
Implementer Assignment | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change implementer group that the change request is set to the Planning in Progress status. |
Change Manager Assignment | SMARTIT-CHG-CRQ- | CHG:CRQ: | Notifies change manager group that the change request is set to the Planning in Progress status. |
Change Manager Assignment | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusPIPAssigned_ | Notifies change manager that the change request is set to the Planning in Progress status. |
Change Coordinator Scheduled For Review | SMARTIT-CHG-CRQ-AssigneeGroup-SFRGroupNotification | CHG:CRQ: | Notifies change coordinator group that the change request is set to the Scheduled For Review status. |
Change Coordinator Scheduled For Review | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusSched | Notifies change coordinator that the change request is set to the Scheduled For Review status. |
Change Manager Scheduled for Review | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusSched | Notifies change manager group that the change request is set to the Scheduled For Review status. |
Change Manager Scheduled for Review | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusSched | Notifies change manager that the change request is set to the Scheduled For Review status. |
Implementer Planning | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusPIPAssigned | Notifies change implementer that the change request is set to Planning in Progress and status reason is Assigned, or the change request is set to Planning in Progress and the status reason is set to Assigned from Accepted. This request does not include a task. |
Implementer Scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusScheduled_ | Notifies change implementer group that the change request is set to the Scheduled status. |
Implementer Scheduled | SMARTIT-CHG-CRQ-Implementer-ScheduledAssignment | CHG:CRQ:StatusScheduled_ | Notifies change implementer the change request is set to the Scheduled status. |
Change Coordinator Scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusScheduled | Notifies change coordinator group that the No Impact change request is set to the Scheduled status. |
Change Coordinator Scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusScheduled | Notifies change coordinator that the No Impact change request is set to the Scheduled status. |
Change Manager Scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusScheduled | Notifies change manager group that the No Impact change request is set to the Scheduled status. |
Change Manager Scheduled | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusScheduled | Notifies change manager group that the No Impact change request is set to the Scheduled status. |
Change Coordinator Completion | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusCompleted | Notifies change coordinator that the change request is set to the Completed status with a status reason of Final Review Complete. All tasks in the request have been completed. |
Cancellation | SMARTIT-CHG-CRQ- | CHG:CRQ:StatusCancelled_ | Notifies the Change Manager that the change request is set to Cancelled status. |
Cancellation | SMARTIT-CHG-CRQ-Assignee-CancellationNotification | CHG:CRQ:StatusCancelled_ | Notifies the assignee that the change request has been cancelled. |
Change Coordinator Approval Rejection | SMARTIT-CHG-CRQ-ApprovalRejectionNT | CHG:CRQ:NotifyOnRejectApproval-CA | Notifies the Change Coordinator when the Approver request for the Change Request is Rejected. |
Change Coordinator Approval Rejection | SMARTIT-CHG-CRQ-ApprovalRejectionNT | CHG:CRQ:NotifyOnRejectApproval-CAGrp | Notifies the Change Coordinator group when the Approval for Change Request is Rejected. |
Change Manager Approval Rejection | SMARTIT-CHG-CRQ-ApprovalRejectionNT | CHG:CRQ:NotifyOnRejectApproval-CMGrp | Notifies the Change Manager group when the Change Request approval is Rejected. |
Change Manager Approval Rejection | SMARTIT-CHG-CRQ-ApprovalRejectionNT | CHG:CRQ:NotifyOnRejectApproval-CM | Notifies the Change Manager when the Change Request approval is Rejected. |
Change Coordinator Completion | SMARTIT-CHG-CRQ-Assignee-Group&IndividualClosureNotification | CHG:CRQ:StatusClosed_855_CA | Notifies the individual or the Change Coordinator group when the Change Request has been Closed. |
Change Coordinator Completion | SMARTIT-CHG-CRQ-Assignee-Group&IndividualCompletion | CHG:CRQ:StatusCompleted_855 | Notifies the individual or the Change Coordinator group when the Change Request has been Completed |
Change Coordinator Planning | SMARTIT-CHG-CRQ-Assignee-Group&IndividualPendingNotification | CHG:CRQ:StatusPending_855 | Notifies the individual or the Change Coordinator group when the Change Request is Pending. |
Change Coordinator Assignment | SMARTIT-CHG-CRQ-AssigneeGroup-RFAGroupAssignment | CHG:CRQ:StatusRFACAGrpSetTag_ | Notifies the Change Coordinator whenever a new Change Request is assigned to it |
Change Coordinator Scheduled | SMARTIT-CHG-CRQ-Assignee-IIP | CHG:CRQ:StatusIIPCASetTag_ | Notifies the Change Coordinator when the Change Request is processed for Implementation. |
Change Coordinator Assignment | SMARTIT-CHG-CRQ-Assignee- | CHG:CRQ:StatusRFACASetTag_ | Notifies the Change Coordinator when he or she is assigned as the Change Coordinator. |
Change Manager Completion | SMARTIT-CHG-CRQ-Manager-Group&IndividualClosure | CHG:CRQ:StatusClosed_855_ | Notifies the Change Manager when the change is closed. |
Change Manager Planning | SMARTIT-CHG-CRQ-Manager-Group&IndividualPendingNotification | CHG:CRQ:StatusPending_855_ | Notifies the individual or the Change Manager group when the Change Request is Pending. |
Change Manager Assignment | SMARTIT-CHG-CRQ-ManagerGroup-RFAGroupAssignment | CHG:CRQ:StatusRFA_815_ | Notifies the Change Manager Group when they are assigned as the Change Manager Group for the Change Request. |
Change Manager Scheduled | SMARTIT-CHG-CRQ-Manager-IIP | CHG:CRQ:StatusIIPCMSetTag_ | Notifies the Change Manager when the Change Request is processed for Implementation. |
Change Manager Assignment | SMARTIT-CHG-CRQ-Manager-RFAAssignment | CHG:CRQ:StatusRFACMSetTag_ | Notifies the Change Manager when he or she is assigned as the Change Manager. |
Change Manager Predecessor Completion | SMARTIT-CHG-CRQ-PredecessorStatusInformation | CHG:CHA:NotifyICComplt_801_ | Notifies the Change Manager of a Change Request when the Predecessor Change Request of that Change Request is completed. |
SLA Response Escalated Notification | SMARTIT-CHG-SLM-CHGMGRNTFY | CHG:CRQ:NTMgrSLMEsc_851_ | Notifies the Change Manager when the Change Request is reaching the milestone |
Release Management notification events
The following notification events are related to release management. Configure the rules in which the support staff is notified in the Release Notification Rules form. For example, you can configure that the release manager is notified when the Milestone of a release is set to Planning and the Status is set to Planning Approval.
Release Management notification events
Event | Message tag | Filter | Description |
---|---|---|---|
Approval | SMARTIT-RMS-APR-ApprovalNTForIndividual | Not applicable | Notifies the support staff individual that a release request requires an approval. |
Release Assigned | SMARTIT-RMS_RLM_Assigned_ToIndiv | Not applicable | Notifies the release coordinator to whom the release is assigned. This notification is sent only when the logged in and the release coordinator are not the same. |
Release Assigned | SMARTIT-RMS_RLM_Assigned_ToGroup | Not applicable | Notifies the support group to which the release is assigned. |
Release Updated | SMARTIT-RMS_RLM_Requester-ReceiptConfirmation | Not applicable | Notifies the requester for whom the release request is submitted. This notification is sent only when the submitter and requester are not the same. This happens when the release management application is integrated with an external application by using interface or API. |
Release Updated | SMARTIT-RMS_RLM_StausChanged | Not applicable | Notifies the requester, release coordinator, or assignee group when the status of a release request is changed. This notification is sent according to the release rules configuration. |
Release Updated | SMARTIT-RMS_RLM_Requester-ReleaseCompletionNotification | Not applicable | Notifies the requester when the release request is completed. |
Activity module notification events
The following notification events are related to the activity module. Configure the rules in which the support staff is notified in the Activity Notification Rules form.
Activity module notification events
Event | Message tag | Filter | Description |
---|---|---|---|
Activity Assigned | SMARTIT-AAS_AAS_Assigned_Group | Not Applicable | Notifies support staff group that an activity has been assigned to them. |
Activity Assigned | SMARTIT-AAS_AAS_Assigned_Individual | Not Applicable | Notifies support staff individual that an activity has been assigned to him or her. |
Activity Status Changed | SMARTIT-AAS_AAS_StatusChanged | Not Applicable | Notifies support staff that the status of an activity has been changed. |
BMC Service Request Management notification events
The following tables describe BMC Service Request Management and Work Order Management notification events:
BMC Service Request Management notification events
Event | Description | Message tag | Filter |
---|---|---|---|
Request Status Changed | Notifies the Request Manager when:
Notes:
| SMARTIT-SRM-REQ-Request_Reopen | SRM:REQ:NTMgr_On_Reopen_SetTag |
Work Order Management notification events
Event | Description | Message tag | Filter |
---|---|---|---|
Work Order Submit | Notifies the Requested By (Contact) and Requested For (Customer) users on submission of a work order. | SMARTIT-WOI-WOI-Submitted-RequestedForBy | WOI:WOI:NTNotify RequestedByOnSubmit_2 WOI:WOI:NTNotify RequestedFor_1 |
Work Order Manager Assignment | Notifies the Work Order Manager (Request Manager) when the work order is Assigned. | SMARTIT-WOI-WOI-Assignment_ Notification | WOI:WOI:NTNotify AssigneeManager_ CALLGUIDE |
Work Order Manager Assignment | Notifies the Assignee Manager group when the work order is submitted and Assignment Engine integration is not set to Yes in the work order rules. | SMARTIT-WOI-WOI-Assignment_ Manager_ | WOI:WOI:NTNotify AssigneeManager Group_Submit_CALL GUIDE |
Work Order Assignee Assignment | Notifies the Assignee Group when the work order is Submitted and the Assignment Engine is not set to Yes in the work order rules. | SMARTIT-WOI-WOI-Assignment_ Assignee_ | WOI:WOI:NTNotify AssigneeGroup_ Submit_CALLGUIDE |
Work Order Assignee Assignment | Notifies the Assignee Group when the Request Assignee support group is updated and not assigned to any individual Request Assignee. | SMARTIT-WOI-WOI-Assignment_Assignee_Group_ | WOI:WOI:NTNotifyAssigneeGroup_ |
Work Order Status Pending | Notifies the Requested For (Customer) user when the work order moves to the Pending state. | SMARTIT-WOI-WOI-Status Updated | WOI:WOI:NTNotify RequestedForOn Pending |
Work Order Status Pending | Notifies Assignee Group when the Work Order Status is moved to Rejected or Cancelled state and the work order is not assigned to an individual Request Assignee. The Notification is sent only when Request Assignee Support Group is different from the Request Manager Support Group. | SMARTIT-WOI-WOI-Status Updated | WOI:WOI:NTNotify AssigneeGroup_ onStatusChanged |