Creating and viewing composite metrics
To create a composite metric
- Find a metric that you want to use for creating a composite metric.
For example, CPU Utilization (percent). - Click
and search for another metric that uses the same UoM or the same metric belonging for another source.
- Click
from the search results to add the metric. If required, add more metrics to the comparison.
- After adding all the metrics, click
and use the Composite section to create a composite metric. Select one of the available options to create a composite metric that represents the average, sum, minimum, or maximum of the metrics with the same UoM.
If your chart has multiple sets of metrics that have the same UoM, add multiple composite metrics.
Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*