Fresh installation ready reference
This page gives a high-level flow, right from preparing your environment for installation to the actual installation procedure.
It also includes any optional configuration that you might need. Note that once you have installed the optional products, you must ensure that you perform the following steps before you go live:
- Perform sanity checks
- Apply customizations as per your requirement
- Perform sanity checks after customization
- Complete user acceptance tests
This topic includes the installation flows for the following deployment types:
Small Deployment
Small or Medium Deployment with High Availability (HA)
Required steps | |
---|---|
Step | Task |
Preparing for installation | |
Verifying the installation | |
Optional steps | |
Step | Task |
Enabling SSL | |
Set up the initial configuration |
|
Configure environments | |
Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*