Docs.bmc.com will undergo a brief maintenance outage 27 March 2025. The site will be unavailable for ten minutes starting at 6:30 AM CDT/5 PM IST.

  Space banner This version of the product is in limited support. However, the documentation is available for your convenience. You will not be able to leave comments.

Assigning a report


To assign a report to an object proceed as follows:

  1. Select the main node containing the object you want to assign a report to in the left window pane.
  2. Select the desired object in the left window pane.
  3. Select its subnode Report Results in the left window pane.
  4. Select Edit > Assign Report link.png.
     The Assign a Report dialog box appears.
  5. Select the desired report from the list in the dialog box.
  6. Click OK to confirm the assignment.
     A confirmation window appears.
  7. Click either the
    • Yes to immediately generate the newly assigned report.
    • No to only add it to the list of assigned reports.

The selected report was assigned to the selected object.