Page tree

The following sections describe the prerequisites that you must perform before you upgrade BMC ProactiveNet to Infrastructure Management:

Prerequisite

Section

Review the general prerequisites such as the system requirements and recommendations before you upgrade the product.

General Prerequisites

Ensure that you back up the database so that you can restore the database with if the upgrade fails.

Prerequisites for database

Review the requirements for Microsoft .NET Framework.

Prerequisites for Microsoft .NET Framework

Ensure that you disable any custom schedulersDisabling custom schedulers

Migrate the configuration of cells.

Migrating the configuration of cells

General Prerequisites

The following are some of the general prerequisites that you must review before upgrading:

  • Review the system requirements and recommendations for Infrastructure Management 9.6.00.
  • On Solaris or Linux, reserve at least 4 GB of space in the /tmp directory. The X Windows utility is required to launch the upgrade GUI utility.
  • You should be an advanced user with good technical understanding and expertise in using the product. To perform the upgrade, BMC recommends that you are an experienced administrator/user with the following skills:
    • Knowledge of the various components
    • Knowledge of network connectivity and communication protocols
    • Knowledge, experience, or both in the design and maintenance of Cell Knowledge Bases (KBs)
    • Experience as a Sybase or Oracle administrator, depending on the database you use
    • Experience in installing and configuring BMC Atrium components
  • Back up the BMC TrueSight Infrastructure Management Server and database. If the servers are on virtual machines, take snapshots of the BMC TrueSight Infrastructure Management Server(s) and Integration Service hosts.
  • Ensure to close all the files and folders opened in the current session as well as close other user sessions on the server before starting an upgrade.
  • Change all the BMC ProactiveNet services to MANUAL, stop the server, and reboot the host to unlock any process that are running in background.
  • Ensure to stop access to  BMC ProactiveNet Performance Management Sybase or Oracle database by other BMC products (For example, Infrastructure Management Performance Management Reporting or BMC Capacity Optimization) or third party products. Once the upgrade is done, you can resume the access. 

Note

Build to build upgrade is not supported.

Prerequisites for database 

The following are the database prerequisites that you must review before upgrading:

  • Check the pruning and retention period for the stats data. Ensure the retention period is less than 10 days.
    To check this, from a command prompt, run the following command:
    pw log period list –stats
  • Minimize the number of stats partition. For more information, refer to KA426277 (Support login required).
  • BMC recommends that you archive the BMC ProactiveNet Server database before upgrading to Infrastructure Management 9.6.00.

    Note

    You cannot automatically upgrade BMC ProactiveNet Server with a Sybase database to a BMC TrueSight Infrastructure Management Server with Oracle database or BMC ProactiveNet Server with a Oracle database to a BMC TrueSight Infrastructure Management Server with OSybase database.

    Please contact BMC Services Account Manager or BMC Support.

     

    Sybase database
    If you use Sybase as the database, run the pw database archive command, as shown in the following example:

    pw database archive  <archiveDirectory>


    archiveDirectory represents the directory where you want to archive the database files. Ensure that the directory has sufficient disk space to store the database. For additional information about the pw database archive command, see pw database archive.

    Tip

    If the upgrade to Infrastructure Management 9.6.00 fails, run the pw database restore command to restore the database from the archive directory. For more information about the pw database restore command, see pw database restore.

     

    Oracle database
    If you use Oracle database as the database, you must back up the Oracle database schema related to BMC ProactiveNet before upgrading to Infrastructure Management. It allows you to restore the database without any loss of data if the upgrade fails.

Prerequisites for Microsoft .NET Framework

On the existing BMC ProactiveNet Server that has Microsoft Windows as the operating system, ensure that Microsoft .NET Framework version 3.0 is installed as it is required to use the SCOM adapter. During the BMC ProactiveNet Server upgrade to Infrastructure Management Server, an error message is displayed if Microsoft .NET Framework is not installed.

To install .NET Framework on Windows 2008, use the Role Management tool. For more information about how to install the .NET Framework, see the Microsoft web site.

Note

The installation of .NET Framework might take several minutes to complete.