You can roll back an Oracle patch package that has been applied to a node, and return the node to the previous patch level.
Ensure the following prerequisites are met:
In the Job Options page, specify any of the following Job options, and click Next.
Type | Option | Description |
---|---|---|
Notification Emails | Email List | (Optional) Click Add Email to add email addresses to the notification list. |
| SNMP | (Displays when SNMP is configured) Select to send the results of this job to an SNMP destination. See Configuring SNMP. |
Job Administration | Cleanup Agent Logs | (Optional) Select to automatically remove logs that are generated by BMC Database Automation on the Agent after the job is complete. |
If the Change Control page displays, populate the following fields, and click Next.
Section | Field | Description |
---|---|---|
| Bypass Change Control | (Optional) Select to bypass using BMC Remedy ITSM to control the change process. Selecting this option removes the rest of the fields from this page. |
| Change Control Options | Select to determine whether to open a new BMC Remedy ITSM change ticket, or to use an existing BMC Remedy ITSM change ticket to control the change process.
|
Use Existing Change Ticket | ITSM Change ID | Specify the BMC Remedy ITSM change ticket number to associate with this change process. |
| ITSM Task ID | Specify the BMC Remedy ITSM task ID number to associate with this change process. |
Create New Change Ticket | Change Type | Assign the type of change for the new BMC Remedy ITSM change ticket. |
| Change Impact | Assign the impact level of this change process for the new BMC Remedy ITSM change ticket. |
| Change Urgency | Assign the urgency level for the new BMC Remedy ITSM change ticket. |
| Change Risk-Level | Assign the risk level of this change process for the new BMC Remedy ITSM change ticket. |
| Change Class | Assign the change class for the new BMC Remedy ITSM change ticket. |
| Change Summary | Type a summary of the change process. |
Note
The Change Control page appears only when change control is configured for your environment. See Configuring change control.
To create the database without having first run the pre-verification steps, select Skip Pre-Verification Tests.
Note
The Skip Pre-Verification Tests option should only be used when you are certain all tests can succeed. The option skips verification and advances directly to the actual provisioning activity.