Replacing a BatchPipes subsystem
You can replace a BatchPipes subsystem with a Job Optimizer Pipes Subsystem without an IPL.
The Job Optimizer Pipes Subsystem name can be the same as the existing BatchPipes subsystem.
To replace an existing BatchPipes subsystem
- Copy the JOPSDISC procedure in the BSS.SAMPLIB data set to a system procedure library.
- Stop the BatchPipes subsystem.
- Execute the JOPSDISC procedure by issuing the following command:S JOPSDISC,SSNAME= BatchPipesSubsystemName
Start the Job Optimizer Pipes Subsystem by using the BatchPipes subsystem name that you specified in step Step 3.
Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*