Scaling LPAR R4HA Reduction Activity by a percentage
Use the following procedure to scale the LPAR R4HA Reduction Activity by a percentage to see the potential changes that occur by either increasing or decreasing the amount of MSUs that are reduced from the R4HA peak. For a particular LPAR, you can scale:
- Mobile reduction activity
- zCAP reduction activity
To scale the LPAR R4HA reduction activity by a percentage
- In the Workload Actions column, click
.
The Scale Mobile Reduction for lparName dialog displays as shown in the following figure:
The following table describes the curves you can display in the charting area:Chart curve
Description
Actual LPAR R4HA MSU
Amount of R4HA utilization measured for the interval
The value indicates the total MSU utilization for the interval.
Adjusted LPAR R4HA MSU
Amount of R4HA utilization after applying the Combined Activity reduction
The value indicates the R4HA MSU utilization after applying the Combined MSU Reduction.
In this example, the MSU utilization after reducing the total MSU utilization by a value of 60% of the LPAR Mobile Activity for the same interval.
LPAR R4HA Reduction Activity
Amount of Mobile Workload R4HA and/or zCAP R4HA utilization for the interval
The different colors of the bar chart indicate values for the total number of R4HA MSUs identified as mobile transactions and the total number of R4HA MSUs identified as zCAP activity.
Defined Capacity
Displays or hides a line to designate the LPAR Defined Capacity on the charts
If the Defined Capacity value is 0 MSUs, no line is displayed.
This dialog enables you to:
- Select which curves to display in the charting area
- Compare the MSU Reduction Activity (Mobile or zCAP) to the R4HA MSU Utilization
- Scale the MSU Reduction Activity (Mobile or zCAP) by a percentage and analyze the results
In the Operations pane, you can increase (grow) or decrease (shrink) the Mobile or zCAP activity by entering a percentage number or by using the +/- buttons. After you specify a percentage, the chart refreshes and displays curves based on your specification.
- When finished specifying LPAR R4HA Reduction Activity percentage, click Apply Adjustments.
The Planning tool applies changes to the model and performs an evaluation. When prompted to view the evaluation results, click Yes to view them (as described in Viewing the Plan Evaluation Summary Report or No to continue working.
Related topic