Opening a plan


Use the following procedure to open a plan.

Important

After launching the MLC Planning tool, the Actions pane displays a list of Recent Plans. As a shortcut, you can click any plan in the list to open the plan.

  1. From the Cost Management console, click the MLC Planning tool tab.
  2. In the Actions pane, click Open Plan.

    Tip

    Alternatively, you can click on any plan from the list of Recent Plans to open that plan directly.

    From the Open Plan dialog box, select the plan you want to open and click Open Plan.

    The MLC Planning tool opens the Plan as shown in the following figure:
    25.2 Opening a Plan png.png

    #

    Description

    Details

    1Actions Pane 

    You can perform the following actions:

    • Create a new plan based on your workload or one selected workloads. For more information, see Creating plans
    • Open an existing plan to review it. 
    • Delete plans that are no longer needed.  
    • Save a copy of a plan
      For more information, see To save a copy.

    2Plan usage monthMonth and year of plan
    3Plan name

    The name of the plan

    The icon indicates the plan type:

    • lpar and workload plan icon.PNG- LPAR and Workloads plan
    • job and stc plans icon.PNG- Job and STC plan
    4List of CPCsClick a CPC to view CPC level reports and charts.
    5List of LPARs on the CPCClick an LPAR to view LPAR level reports and charts.
    6Toolbar buttonsYou can use the toolbar buttons to perform the actions described in the table below.
    7Information message

    Status of the Evaluation Summary Report for the plan

    Click View details to open the Application Messaging Viewer dialog box to view the messages returned from the evaluation process.

    8ViewerDisplays reports, charts, and evaluation details for the selected plan.

    Toolbar button

    Description

    gear icon.PNG

    View changes made to the plan.

    evaluation plan icon.PNG

    View plan evaluation results.

      1745303325215-346.pngModify the plan.
    For more information, see To modify a plan.

    close plan icon.PNG

    Close the plan.

  3. Perform one of the following actions:

    • Click a CPC to view CPC level reports and charts.
    • Click an LPAR to view LPAR level reports and charts.

    The MLC Planning tool opens the selected object. Depending on which level you select, you can perform operations on the objects of the CPC level or LPAR level. For more information, see Overview-of-LPAR-and-Workload-plans.

 

 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*