Overview of the Manage TFP Configurations tool



Use the Manage TFP Configurations tool to create multiple solutions for your TFP configuration. You can also select a solution for DevTest.


Important

You can mark only one solution for DevTest in each TFP configuration.

When you launch the Manage TFP Configurations tool, the Manage TFP Configurations dialog box is displayed. By default, there are no TFP configurations available. After you add TFP configurations, the Available TFP Configurations field lists them.

image2021-5-20_11-8-55.png

The Manage TFP Configurations fields are as follows:

#

Field

Description

1

Available TFP Configurations

Lists the TFP configurations that you create

2

Click here to create a new TFP Configuration

Creates a TFP configuration

3

Add

Adds or creates a TFP configuration

4

Modify

Modifies an existing TFP configuration

5

Remove

Removes a TFP configuration

You can create or add TFP configurations using the Add TFP Configuration dialog box. For each TFP configuration, you can create solutions by using the General, Cost, and LPARs options. 

image2021-8-5_16-31-55.png

The Add TFP Configuration fields are as follows: 

#

Field

Description

1

Name

(Required) Enter a name for the TFP configuration

2

Description

(Optional) Add a description for the TFP configuration

3

Distribution Start

(Required) Enter the year and month to calculate the annual MSU entitlement

4

Create Solution

Create one or more solutions for a TFP configuration

To add a solution to a TFP configuration, use the General, Cost, and LPARs tabs.

5

Delete Solution

Delete a solution from a TFP configuration

6

Template

Lists the TFP configurations that you save

7

General

The General tab includes:


      • Solution Name: (Required) Enter a solution name
      • Solution ID: (Required) Enter the solution ID provided by IBM
      • IS DevTest: (Optional) Select to include the solution for DevTest

Important

When you select IS DevTest:

  • The Annual MSU Entitlement field on the General tab is replaced by Monthly Peak R4H4 MSU Entitlement field.
  • The Cost per MSU field on the Cost tab is replaced by DevTest Fixed Cost field.

8

Cost

The Cost tab includes:


    • Annual MSU Entitlement: (Required) Enter the number of MSU that you are entitled to based on your agreement with IBM.
    • Cost per MSU: (Required) Enter the cost defined for each MSU when within your MSU entitlement limit.
    • Cost per MSU Over Entitlement: (Required) Enter the cost defined for each MSU after you exceed your MSU entitlement limit.

9

LPARs

The LPARs tab includes:


    • Add LPARs to Solution: (Required) Lists the LPARs
    • Month picker: (Optional) Select a month for cost modeling (displays all the LPARS available for the month)
    • Solution LPARs: Displays the LPARs that you select
    • Remove: Delete an LPAR from a solution

The General, Cost, and the LPARs fields are as follows:

image2021-3-31_14-58-58.png

 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*