Cost Variance by Billing Month quadrant
The Cost Variance by Billing Month quadrant contains a bar chart that displays the cost difference between the budgeted amount and actual or projected cost for every billing month of the contract.
A sample of Cost Variance by Billing Month chart is as follows:
The following table describes the elements of the chart:
Chart Element | Description |
---|---|
Actual cost difference of the billing month | |
Projected cost difference of the billing month | |
Green Bar | Indicates the actual or projected cost was less than the budgeted cost for the billing month |
Red Bar | Indicates the actual or projected cost was greater than the budgeted cost for the billing month |
You can hover the mouse over any point or bar on the chart to view the date it occurred.
The toggle dotson the quadrant provide you with the ability to toggle between the following chart views:
- Cost Variance by Billing Month
- Cost Variance to Date
You can also use Options to change the display of the chart as follows:
- Single period view
- Stacked period view
Grouped period view
For more information see about these views, see Changing-the-chart-period-views.
Hyperlinks to the MLC Monthly Summary Report
Each bar of the chart (whether solid or striped) is a hyperlink to the MLC Monthly Summary Report for that billing month. By clicking on the bar, Cost Management opens the Monthly Reporting tool and generates the MLC Monthly Summary Report for that billing month.
A sample of MLC Monthly Summary Report for a billing month is as follows:
You can drill-down into the MLC Monthly Summary Report for an in-depth analysis of the utilization data. For more information, see Drill-down-levels-for-Monthly-Summary-Reports.