Limited supportBMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see BMC AMI Cost Management 24.1.00.

Cost Variance by Billing Month quadrant


The Cost Variance by Billing Month quadrant contains a bar chart that displays the cost difference between the budgeted amount and actual or projected cost for every billing month of the contract.

A sample of Cost Variance by Billing Month chart is as follows:

cost variance by month.PNG

The following table describes the elements of the chart:

Chart Element

Description

green bar.PNG

Actual cost difference of the billing month

faded green bar.PNG

Projected cost difference of the billing month

Green Bar

Indicates the actual or projected cost was less than the budgeted cost for the billing month

Red Bar

Indicates the actual or projected cost was greater than the budgeted cost for the billing month

Tip

If you want to examine the interval details of the chart, maximize the display of the quadrant using maximize.PNG, and then click on any point in the chart area.

You can hover the mouse over any point or bar on the chart to view the date it occurred.

The toggle dotsimage2020-9-2_15-49-30.pngon the quadrant provide you with the ability to toggle between the following chart views:

  • Cost Variance by Billing Month
  • Cost Variance to Date

You can also use Optionsgear icon.PNG to change the display of the chart as follows:

Note

The Cost Variance by Month quadrant contains a link to the Software Cost by Product view. You can access the chart by clicking drilldown link icon.PNG. For information about the Software Cost by Product view, see Accessing-and-working-with-the-Software-Cost-by-Product-view.

Hyperlinks to the MLC Monthly Summary Report

Each bar of the chart (whether solid or striped) is a hyperlink to the MLC Monthly Summary Report for that billing month. By clicking on the bar, Cost Management opens the Monthly Reporting tool and generates the MLC Monthly Summary Report for that billing month.

A sample of MLC Monthly Summary Report for a projected billing month is as follows:

image2020-8-19_17-32-33.png

You can drill-down into the MLC Monthly Summary Report for an in-depth analysis of the utilization data. For more information, see Drill-down-levels-for-Monthly-Summary-Reports.

Tip

At any time, when you want to return to the MLC Software Contract report, click on the MLC Software Contract Reporting tool tab.

This section contains the following topic:

Related topic




 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*