Limited supportBMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see BMC AMI Cost Management 24.1.00.

Viewing the Plan Evaluation Summary Report


You can view the changes executed on a CPC, LPAR or workload in a plan. Whenever you make changes to objects within a plan, you can view the results in the Plan Evaluation Summary Report.

To view the Plan Evaluation Summary Report

  1. Use either of the following methods to access the report:

    • In the Actions pane, click the View plan evaluation results evaluation plan icon.PNG.
    • After executing a change in a plan, click Yes when prompted to view the evaluation results.

The MLC Planning tool opens a Plan Evaluation Summary Report with rows that list MLC Products and columns that display relevant data as follows:

image2020-9-10_9-18-6.png

If the data in a column can be sorted, when you hover over the column header, the header is highlighted.

The columns contain data similar to the MLC Monthly Summary Report. For a description of each column, see Monthly-Summary-Reports.

The following table describes the columns that are unique to this report:

Column header

Description

Cost Change

The change in cost resulting from the changes made to the plan

Old R4HA First Peak (MSU)

R4HA value in the cost model that was used to build this plan

The old value designates the starting value before the changes were executed.

Old R4HA First Peak Date

Date and time of the old R4HA Peak (MSU)

The Cost Change column details any change to the cost of the MLC Product caused by the LPAR move. A cost reduction is indicated by GUID-3C64AD78-F7EA-4708-986B-DE70AD18D24E-low.png and the amount of the gain. A cost increase is indicated by GUID-DC4CA6B6-80A3-467E-87C3-91CC3A2B2C31-low.png and the amount of the loss.

You can scroll to the bottom of the report to view the total gain, loss, and difference.

For any additional information about the Plan Evaluation Summary Report, click More.

image2020-9-10_9-36-2.png

By using the Export to CSV and the Save to PDF links, you can save the report data on your local computer as a CSV or PDF file.

A sample PDF file is as follows: