Writer instructions

Page title

For most spaces, this page must be titled Space announcements.

For spaces with localized content, this page must be titled Space announcements l10n.

Purpose

Provide an announcement banner on every page of your space.

Location

Move this page outside of your home branch.

Guidelines

Limited supportBMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see BMC AMI Cost Management 24.1.00.

Managing CPC Configuration


After building cost models, 

Cost Management

 uses IBM default rules for sub-capacity licensing to produce a configuration of your CPCs. The configuration defines the default pricing metric type and PricingPlex grouping for each CPC. You should verify and if needed edit the initial configuration so that each CPC has correct values defined.

Cost Management uses the most recent cost model to produce the configuration; you have access to the configuration after running a Model Builder Task for the first time. For more information, see Scheduling-Model-Builder-Tasks

After the initial configuration, any new CPCs are added automatically, but any changes to the existing configuration will not be recorded. For instance, you must manually update the configuration if the PricePlex of a CPC or the Pricing Metric changes.

This section contains the following topics: 


 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*