Writer instructions | |
---|---|
Page title | For most spaces, this page must be titled Space announcements. For spaces with localized content, this page must be titled Space announcements l10n. |
Purpose | Provide an announcement banner on every page of your space. |
Location | Move this page outside of your home branch. |
Guidelines |
Estimating the CMP Base values
You can use the CMP Base Factor Estimator to calculate the CMP Base values (MLC Base, MSU Base, and Base Factor) for all products and product features active in a selected month and the two previous months.
- From the console, click Cost Management Tools.
- From the Cost Management Tools list, click MSU Cost Editor.
Open the cost table for which you want to estimate the CMP Base Factor values, and click CMP Base Factor Estimator
.The CMP Base Factor Estimator dialog box is displayed.
In the dialog box, select the month to use for the calculation.Up to three months of non-CMP data are necessary to estimate the CMP Base Factor values. When you select a month, the estimator automatically includes the two previous months when making the calculation.
- Click Estimate, and then click Yes to confirm that you want to overwrite the current CMP Base values if they exist.Cost Management calculates an estimate of the CMP Base Factor values and applies the changes to the open cost table.
- Click Save Changes.
Related topic