Checklist of Milestones and Tasks
❏ Milestone 1: Ensure Installation and Configuration of Companion
Products
❏ Task 1.1 Install/Upgrade Enterprise Common Components
❏ Task 1.2 Apply ECC Maintenance
❏ Task 1.3 Import Code Pipeline License
❏ Milestone 2: Prepare for Installation
❏ Task 2.1 Establish Code Pipeline Dataset Naming Conventions
❏ Task 2.2 Determine High-Level Qualifiers and Warehouse ID
❏ Task 2.3 Set Up an SAF Class
❏ Task 2.4 Create UserIDs for Started Tasks
❏ Task 2.5 Plan System Libraries
❏ Task 2.5.1 Determine ISPF Dataset Names
❏ Task 2.5.2 Determine Compiler and Related Dataset Names
❏ Task 2.6 Plan Started Task Parameters
❏ Task 2.6.1 Determine Started Task Common Parameters
❏ Task 2.6.2 Determine CM Started Task Parameters
❏ Task 2.6.3 Determine CI Started Task Parameters
❏ Task 2.6.4 Determine CT Started Task Parameters
❏ Task 2.6.5 Setting the Priority of Code Pipeline Started Tasks
❏ Milestone 3: Prepare Db2 Repository
❏ Task 3.1 Determine Basic Db2 Subsystem Information
❏ Task 3.2 Plan an Authorization Strategy
❏ Task 3.3 Plan Db2 Subsystem Resource Utilization
❏ Task 3.4 Develop Db2 Code Pipeline Naming Standard
❏ Task 3.5 Planning for Other Items
❏ Milestone 4: Install Code Pipeline Using SMP/E
❏ Task 4.1 Follow the BMC Installer Mainframe Products SMP/E Installation Guide
❏ Milestone 5: Create Configuration Environment
❏ Task 5.1 Launch the Installation Configuration Dialog
❏ Task 5.2 Specify the Code Pipeline Repository Dataset
❏ Task 5.3 Specify Environment Values
❏ Milestone 6: Define/Provide System Libraries
❏ Task 6.1 Provide ISPF Dataset Names
❏ Task 6.2 Provide Compiler and Related Dataset Names
❏ Milestone 7: Db2 Customization
❏ Task 7.1 Enter Db2 Subsystem Information
❏ Task 7.2 Enter Code Pipeline Db2 Names, Sizing, and Image Copy Values
❏ Milestone 8: Define Started Tasks
❏ Task 8.1 Define Common Parameters
❏ Task 8.2 Extract Extra Parameters
❏ Task 8.3 Define CM Specific Parameters
❏ Task 8.4 Define CI Specific Parameters
❏ Task 8.5 Define CT Specific Parameters
❏ Task 8.6 Generate Started Task PARMLIB Members
❏ Milestone 9: Create Base Datasets
❏ Task 9.1 Generate Base Dataset Creation and Customization Job
❏ Task 9.2 Run Base Install Datasets Creation Job
❏ Task 9.3 Copy Started Task PROCs
❏ Milestone 10: Install Base Software
❏ Task 10.1 Launch the Guided Configuration Dialog
❏ Task 10.2 Create SITE Datasets
❏ Task 10.3 Copy Code Pipeline Command Table
❏ Task 10.4 Define Dataset Allocations
❏ Task 10.4.1 Add Code Pipeline AUTHLINK to LINKLIST
❏ Task 10.5 Authorize Load and Link Libraries
❏ Milestone 11: Install Db2 Repository
❏ Task 11.1 Run Db2 Installation Jobs
❏ Milestone 12: Starting the Started Tasks
❏ Task 12.1 Start the CM
❏ Task 12.2 Start the CI
❏ Task 12.3 Start the CT
❏ Task 12.4 ISPF Dialog
❏ Milestone 13: Load Initial Reference Data
❏ Task 13.1 Navigate to the Reference Data Update Menu
❏ Task 13.2 Import Sample Component Type Data
❏ Task 13.3 Activate the Newly Loaded Data
❏ Task 13.4 Refresh the Server
❏ Milestone 14: Configure
Workbench for Eclipse
Integration❏ Task 14.1 Check Code Pipeline Maintenance Level
❏ Task 14.2 Check and Setup Communication Configurations
❏ Task 14.3 Check Values in CT Server Definition
❏ Task 14.4 Check Communications Access
❏ Milestone 15: Installation Verification Procedures
❏ Task 15.1 IVP #1
❏ Task 15.1.1 Create Code Pipeline Assignment and Add Task
❏ Task 15.1.2 Checkout and Promote Up One Level
❏ Task 15.1.3 Use a Set to Promote to PROD
❏ Task 15.1.4 Repeat Process to Test Warehouse
❏ Task 15.2 IVP #2
❏ Task 15.2.1 Create New Assignment
❏ Task 15.2.2 Implement Required Skeletons
❏ Task 15.2.3 Import PLAY Application
❏ Task 15.2.4 Allocate PLAY Datasets
❏ Task 15.2.5 Create Training Components
❏ Task 15.2.6 Create PLAY Assignment
❏ Task 15.2.7 Register Components to Code Pipeline
❏ Task 15.2.8 Initial Load of Impact Data
❏ Task 15.2.9 Import Sample Members for Generates
❏ Task 15.2.10 Test Compile System
❏ Milestone 16: Install Optional Code Pipeline DNA
❏ Task 16.1 Install DNA Facility
❏ Task 16.1.1 Disable Scanners
❏ Task 16.1.2 Add DNA-Related Exits
❏ Task 16.1.3 Set Technology to DNA for All Supported INCLUDE File Types
❏ Task 16.1.4 Add DN Command to WVOPALL and Include CRMODEL with Value 2
❏ Task 16.1.5 Copy SAMPLIB Members
❏ Task 16.1.6 Import New Skeleton
❏ Task 16.1.7 Modify Generate Skeletons
❏ Task 16.2 Perform Bulk Initialization of DNA
❏ Task 16.2.1 Add DNA to Code Pipeline Components
❏ Task 16.2.2 Create the Cross-Reference Main Driver
❏ Task 16.2.3 Populate Assembler Cross-References
❏ Task 16.2.4 Populate COBOL Cross-References
❏ Task 16.2.5 Populate PL/I Cross-References
❏ Task 16.2.6 Populate LINK Cross-References
❏ Task 16.2.7 Deal with Special Cases
❏ Milestone 17: Code Pipeline External Function Processor Enhancement
❏ Task 17.1 Specify CT Startup Parameters
❏ Task 17.2 Specify Cross-Memory ID
❏ Task 17.3 Enable Variable