Creating eLinks


An eLink is the 

Energizer

 address space that provides the communications between the UIM server, the operator console, and the IMS Connects.

You do not need an eLink or an eLink started task to use the ISPF or console interfaces. You only need an eLink to be able to enter Energizer commands from an z/OS operator console.

If you intend to run Energizer without running an eLink address space, you must specify the host name and port number to the options for each IMS Connect that is defined to Energizer. Without the host name and port number, the Database Console cannot communicate with the IMS Connect. You can add the host name and port number by using the IMS Connect Options panel in the Energizer ISPF interface. You can activate the changes by reloading the IMS Connect options from the ISPF interface, or by clicking Save and Reload in the Edit Configuration - General Tab of the Database Console.

For more information, see the Energizer for IMS Connect User Guide.

 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*