Limited supportBMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see UNLOAD PLUS for DB2 13.1.

Troubleshooting SmartSwitch


If SmartSwitch fails when attempting to switch a job from UNLOAD PLUS to BMC AMI Unload, resubmit the original UNLOAD PLUS JCL with the UNLOAD PLUS restart parameter:


    • If BMC AMI Unload can run the failed job, SmartSwitch automatically translates the restart parameter specified in the UNLOAD PLUS PARM= clause to be BMC AMI Utilities compatible, as follows:

      UNLOAD PLUS parameter

      BMC AMI Unload parameter

      Null

      RESTART

      NEW

      NORESTART

      RESTART

      RESTART

      NEW/RESTART

      RESTART

      NEW/RESTART(PHASE)

      RESTART

      TERM

      QUICKEXIT

    • If BMC AMI Unload cannot run the failed job, UNLOAD PLUS runs the job.

 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*