Rule checking
Result | Description |
---|---|
FORCE_NO_SWITCH | SmartSwitch forces the job to run with LOADPLUS. |
ALLOW_SWITCH | SmartSwitch switches the job to BMC AMI Load if both of the following conditions are satisfied:
|
REPORT_SWITCH | Smartswitch reports whether the job can be switched to BMC AMI Load. LOADPLUS will finish processing the job. |
When running REPORT_SWITCH, one of the following results appears in the BMCHIST table:
Result | Description |
---|---|
NGTG | SmartSwitch switches the job to BMC AMI Load if you select the ALLOW_SWITCH rule. If you select the REPORT_SWITCH rule, LOADPLUS processes the job. For information about the REPORT_SWITCH rule, see REPORT_SWITCH. |
NGTNOG | SmartSwitch does not switch the job to BMC AMI Load if you select the ALLOW_SWITCH rule. LOADPLUS processes the job. |
If the job does not match any rules in the rules table, or the rules table contains no rules, SmartSwitch uses the following implied rule and determines that LOADPLUS should execute the job:
LPAR SSID AUTHID DBNAME SPNAME OBJTYPE UTILITY RULE
------------------------------------------------------------------------
% % % % % ALL ALL FORCE_NO_SWITCHIf BMC AMI Load cannot run the job, SmartSwitch determines that the PLUS utility should run the job with a message confirming this determination.
For more information, see Limitations.
For more information about switching, see
In all cases, the contents of the COMMENT column for the matching rule is displayed in a message and in the LOADPLUS SYSPRINT.
The following flowchart summarizes the rule-checking process: