Limited supportBMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see LOADPLUS for DB2 13.1.

Troubleshooting SmartSwitch


If SmartSwitch fails when attempting to switch a job from LOADPLUS to BMC AMI Load, resubmit the original LOADPLUS JCL with the LOADPLUS restart parameter:

  • If BMC AMI Load can run the failed job, SmartSwitch automatically translates the restart parameter specified in LOADPLUS's PARM= clause to be BMC AMI Utilities compatible, as follows:

    LOADPLUS parameter

    BMC AMI Load parameter

    Null

    RESTART

    NEW

    NORESTART

    RESTART

    RESTART

    NEW/RESTART

    RESTART

    NEW/RESTART(PHASE)

    RESTART

    TERM

    QUICKEXIT

  • If BMC AMI Load cannot run the failed job, LOADPLUS runs the job.


 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*