Scheduling ETL for multiple sites
You can schedule ETL runs for multiple
sites, however, ETL runs cannot occur in parallel. Only one ETL run can happen at a time. You can schedule ETL runs sequentially.You can schedule ETL runs in one of the following ways:
- On the reports server, schedule multiple calls to the run_etl.nsh script to different
For information about setting up this scheduling, refer to your operating system documentation. databases by using platform-specific operating system scheduling. - In the , configure a batch job that includes multiple calls to the run_etl_from_om.nsh script to different databases.
Ensure that these scheduling methods do not allow parallel ETL runs. Set up the schedules for sequential ETL runs.
Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*