Specifying the project build date
In the last step of the operating system deployment wizard, the schedule for the project build and its activation is defined. Building the project signifies to check that all parameters and values of the project are correct and that all required elements are available and in their correct location.
There are the following build schedule possibilities:
- Either schedule the build immediately, this is also the default selection.
- Postpone the build to a specific date. In this case select the Deferred to radio button. The two time boxes to the right will become available. Enter the desired date and time in the respective boxes. Click the arrow in the drop-down box next to the Deferred to box for the calendar to pop-up. Select the date for the project to be built. Then, in this following list box select the assign time from the list. You can modify the minute value by selecting the :00 and modify it to your needs, for example, 12:30 to launch the assignment at this time.
Activate
For a project to become available for deployment or WIM Capture it must be activated. By default this option is checked in the wizard.
Click Finish to either launch the project build or confirm the project and its schedule.