Modifying the schedule of an operational rule
When you assign a device to an operational rule you might want to modify the execution schedule for this device. Be aware that this only works if the device was directly assigned to the operational rule. If you modify the schedule of a device that was assigned via a device group assignment, the schedule for all members of this group is modified. To modify a schedule, proceed as follows:
- Select the entry in the table for which the schedule is to be modified.
- Click Edit > Properties
.
The Scheduler window appears. It shows a summary of the rule schedule right on top. - Make the necessary modifications by changing the provided options.
- Click OK to confirm the modifications and close the window.
Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*