Modifying an objects schedule with CSM schedule tags


CSM includes three predefined schedules that you can use for scheduling objects:

  • WEEKDAY (WKD): specifies that the object should be DOWN at a specified time on Mondays through Fridays every week
  • WEEKEND (WKN): specifies that the object should be DOWN at a specified time on every Saturday and Sunday
  • DAILY (DLY): specifies that an object should be DOWN at a specified time every day of the week (Monday through Sunday) every week

These tags also can be used in conjunction with schedules for a specific day and time. CSM will take the object down on the specific day in addition to the time specified by any of these tags.

For example, suppose object AAOCSM09 should be DOWN every day from 2:00 A.M. to 3:00 A.M.

To modify AAOCSM09’s schedule

  1. Enter the E line command next to AAOCSM09. The Object Detail Control panel for AAOCSM09 is displayed.
  2. Enter the primary command SCH to display the Object Scheduling panel for AAOCSM09.

    Figure 1. Object Scheduling panel

    BMC Software --- Object Scheduling for AAOCSM09 - Edit --- MainView AutoOPERATOR
    COMMAND ===>                                               SCROLL ===> CSR
                                                                  TGT ---  AO6A
    Primary Commands: ADD CANcel END CMDSHOW
    LC CMDS --------- (E)dit Time, (D)elete Time
    Enter END to process/return to Detail Control, ENTER to continue, or CANcel
    LC Object        Day        Down From     Down To
        Group                      HH:MM       HH:MM
    ******************************* Bottom of data ********************************
  3. Enter the primary command ADD. The Add Object Scheduling panel is displayed.

    Figure 2. Add Object Scheduling panel

    BMC Software --- Object Scheduling for AAOCSM09 - Edit --- MainView AutoOPERATOR
    C | BMC Software             Add Object Scheduling             AutoOPERATOR  |
      | COMMAND ===> _________________________________________ TGT --- AO6A      |
    P |                                                       DATE --- 01/01/30  |
      |                                                       TIME --- 19:27:12  |
    L |                                                                          |
      |    Day Selections:  MON, TUE, WED, THU, FRI, SAT, SUN or WKD, WKN, DLY   |
    E |                                                                          |
      |    Group Name        ===> ________                                       |
    L |                                                                          |
      |    Day               ===> _________                                      |
      |    Down From (HH:MM) ===> __ : __                                        |
    * |    Down To   (HH:MM) ===> __ : __                                        |*
      |                                                                          |
      |                                                                          |
      | Press ENTER to continue processing                                       |
      | Press END(PF3) / CANcel to cancel request                                |
      |---------------------------------------------------------------------------
  4. Enter the word DLY to specify that this object is supposed to be DOWN every day (Monday through Sunday), and enter the times using 24-hour clock format ( 02:00 and 03:00 ).

    Figure 3. Example of times entered on the Add Object Scheduling panel

    BMC Software ------- Object Scheduling for AAOCSM09 - Edit ------ INVALID TIME
    C | BMC Software             Add Object Scheduling             AutoOPERATOR  |
      | COMMAND ===> _________________________________________ TGT --- AO6A      |
    P |                                                       DATE --- 01/01/30  |
      |                                                       TIME --- 19:27:12  |
    L |                                                                          |
      |    Day Selections:  MON, TUE, WED, THU, FRI, SAT, SUN or WKD, WKN, DLY   |
    E |                                                                          |
      |    Group Name        ===> AO6A____                                       |
    L |                                                                          |
      |    Day               ===> DLY______                                      |
      |    Down From (HH:MM) ===> 02 : 00                                        |
    * |    Down To   (HH:MM) ===> 03 : 00                                        |*
      |                                                                          |
      |                                                                          |
      | Press ENTER to continue processing                                       |
      | Press END(PF3) / CANcel to cancel request                                |
      |---------------------------------------------------------------------------
  5. You can enter additional DOWNtimes by using the ADD primary command. Press PF3/END to redisplay the Object Scheduling panel.
  6. Press PF3/END. The Object Detail Control panel is redisplayed.
  7. Press PF3/END again. The Global Overview panel is redisplayed.
  8. To save the changes, enter the SAVE primary command.
  9. Enter the primary command BU on the COMMAND line.The changes take effect when the BUILD command is issued for the group that this object is associated with. CSM issues an error message if it detects a schedule conflict. Note that it is not a conflict to have two identical schedule entries, each for a different group.

 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*

MainView AutoOPERATOR 8.2