Limited supportBMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see BMC AMI Log Master for Db2 13.1.

Adding a Repository maintenance step to a work ID


This procedure explains how to add a Repository maintenance step to an existing work ID.

GUID-9133A792-CFFA-4CF6-9C22-1FA628284AD1-low.png

Before you begin

Ensure that you understand the concepts presented in the following sections:

To add a Repository maintenance step to a work ID

  1. Open the work ID that you want to edit, and access the Step Type panel.For more information, see Creating-and-accessing-a-work-ID.
  2. Select Repository Maintenance and press Enter.Log Master displays the Repository Maintenance Parameters panel. For descriptions of the options on this panel, press F1 to access the online Help.
  3. Modify the values for the options on the panel.
  4. Press F3 until you return to the Work ID File Menu and save the work ID.


 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*