Cross-System Image Manager requirements
- You must APF authorize the following data sets:
- HLQ.NVSAM.UBMCLINK
- HLQ.BMCLINK or HLQ.RTE.BMCLIB
- HLQ.NVSAM.UBMCLIB
- You must be using the job entry subsystem 2 (JES2) or job entry subsystem 3 (JES3) component of the IBM z/OS system.
- On a JES3 component, you must start XIM on the global processor.
- You must install the load modules for XIM into an APF library.
- If version 1.3.00 or earlier of XIM for Db2 or XIM for IMS is already installed on your Db2 subsystem in an authorized library or in a LINKLIST data set, you must upgrade to version 1.3.02 of XIM. Version 3.2.00 and later of the Database Administration solution requires version 1.3.02 of XIM.
- Only one XIMstarted task procedure can be active on each image with the same group name for XIM.
- You must start XIMon every image on which you want to execute a worklist in parallel.
- The dispatch priority for the XIM started task procedure must be set to a higher level than the dispatch priority for the product using XIM (for example, a BMC AMI Change Manager for Db2 batch job or the BMC AMI Reorg for IMS
product). - You must have sufficient system linkage indexes (LXs) for your IBM z/OS subsystems. One LX is required for each XIM address space.
- An available entry must exist in the IBM cross-system coupling facility (XCF) for XIM to define the group, and XCF services must be running in a multi-system environment.
Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*