Specifying an outage window for post-processing


You can use the optional OUTAGE_WINDOW keyword (as shown in the following figure) to specify the earliest and latest time post-processing can start.

During this outage time, the database is unavailable for updates because the areas are taken offline so that the data sets can be swapped.

The value for the OUTAGE_WINDOW keyword is written to the Restructure Plan data set. If the OUTAGE_WINDOW keyword is also specified during restructure processing, it overrides the value in the Restructure Plan data set.

OUTAGE_WINDOW=([start-date-time],[end-date-time])

 