Information

This site will undergo a brief period of maintenance on Friday, 18 December at 12:30 AM Central/12:00 PM IST. During a 30 minute window, site availability may be intermittent.

Editing schedules


You can control the frequency of each scheduled function by editing the corresponding schedule.

Warning

Note

When you have implemented a new schedule or edited an existing schedule, remember to verify that scheduled tasks have been executing as expected.

To edit schedules

  1. Open the schedule for the function that you want to edit:

    • To edit the schedule for backing up repositories, right-click a host object in the Navigation window and choose Configuration > Schedule Repository Backups.
    • To edit the schedule for all other functions, right-click an IMSPLEX in the Navigation window and choose Configuration > Schedules.

    The Schedules window is displayed. For a description of the functions that are listed in this window, see Summary-of-scheduled-functions.

    GUID-9D504920-EFE5-489E-BE99-338A6618F281-low.png

  2. In the Schedules window, double-click the row of the function that you want to schedule.The Edit Schedule dialog box is displayed.Edit Schedule dialog box shows the dialog box for the PURGE function, but all functions use the same parameters.

    GUID-CCF102D9-BA85-4140-A313-F7BEC24619EA-low.png

  3. In the Edit Schedule dialog box, edit data collection information and click Save.For more information about each parameter, including descriptions, valid values, and suggested defaults, see the online Help.




 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*

BMC AMI Database Advisor for IMS 3.2