Information
Space announcement We are no longer updating this space, and you cannot comment on this space. The CHANGE ACCUMULATION PLUS component is now documented in BMC AMI Backup and Recovery for IMS.

Inputs and outputs


This topic shows the primary and optional inputs and outputs that are used in the standard (not PIT) change accumulation process.

An example of Change Accumulation Utility Primary Inputs and Outputs is shown in the following figure:

GUID-5F48125C-6C87-448D-B585-A9107451D594-low.png

An example of Change Accumulation Utility Primary and Optional Inputs and Outputs is shown in the following figure:

GUID-58D1B5A7-71C8-4CFF-96B5-E54E5F1BACEB-low.png

Although DBRC is not required, you normally use it to determine the proper input data sets.

This section contains the following topics:

Related topic



 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*

CHANGE ACCUMULATION PLUS 5.1