Space banner

   

This version of the product has reached end of support. The documentation is available for your convenience. However, you must be logged in to access it. You will not be able to leave comments.

Modifying the schedule of an operational rule

When you assign a device to an operational rule you might want to modify the execution schedule for this device. Be aware that this only works if the device was directly assigned to the operational rule. If you modify the schedule of a device that was assigned via a device group assignment, the schedule for all members of this group is modified. To modify a schedule, proceed as follows:

  1. Select the entry in the table for which the schedule is to be modified.
  2. Click Edit > Properties .
    The Scheduler window appears. It shows a summary of the rule schedule right on top.
  3. Make the necessary modifications by changing the provided options.

    To unassign the schedule select the Prevent this object from running on a schedule option in the Do you want to configure a window in which this rule can run? box.

  4. Click OK to confirm the modifications and close the window.
Was this page helpful? Yes No Submitting... Thank you

Comments