Defining the SCAP job schedule
This step of the wizard concerns the scheduling of the SCAP job on the targets. This dialog box appears either the predefined schedule of an existing group or the default schedule for a new group.
- Define the date and time at which the assignment of the SCAP job to the targets is to be effected in the When do you want to run this job? box.
- Define the date and time at which the actual scan of the SCAP job is to take place in the Do you want to configure a window in which this job can run? box.
- (Optional) Depending on this choice you might have to fill in more boxes and make more selections to define your execution schedule.
- (Optional) Check the Do you want to run a report after this scan? to generate a specific report after the scan has finished.
- Click Finish if you do not want to define a report or click Next to continue with the next step to define the report to generate.