Writer instructions

Page title

For most spaces, this page must be titled Space announcements.

For spaces with localized content, this page must be titled Space announcements l10n.

Purpose

Provide an announcement banner on every page of your space.

Location

Move this page outside of your home branch.

Guidelines

Limited supportBMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see BMC AMI Cost Management 24.1.00.

Scaling a workload by percentage


Use the following procedure to scale a workload by percentage to see the potential cost savings by limiting the workload activity.

You might also scale a workload to evaluate expected workload changes (for example, changes due to a new advertising campaign or to acquiring a new store).

Note

When scaling workload activity, the MLC Planning tool changes the activity of that workload for the entire usage month by the selected percentage.

To scale a workload by a percentage

  1. In the Workload Actions column, clickimage2020-9-2_16-13-25.png.
    The Scale Workload Activity for lparName dialog box is displayed.
    scale workload activity for lpar.PNG
  2. In section 1 of the dialog box, select one or more workloads whose activity you want to adjust.
  3. In section 2 of the dialog box, enter the percentage number, or use defined capacity buttons.PNG to set the percentage of the Workload Work you want to change.
    To increase by a certain percentage, add the percentage to the workload's existing value of 100%. For example, if you wanted to increase the workload by 50%, you would adjust the workload's percentage to 150%.
  4. (Optional) In section 2, enter the percentage number, or use defined capacity buttons.PNG to set the percentage of the Mobile reduction from the LPAR R4HA Reduction Activity you want to change.

    You can increase (grow) or decrease (shrink) a percentage of the Mobile Reduction for the workload's LPAR. In general, when you increase the percentage of the mobile reduction, the LPAR receives a cost reduction and when you decrease the percentage of mobile reduction the LPAR accrues a cost increase. 

    Note

    This option is available only when the selected LPAR has Mobile Reduction activity.

  5. (Optional) In section 2, enter the percentage number, or use defined capacity buttons.PNG to set the percentage of the zCAP reduction from the LPAR R4HA Reduction Activity you want to change.

    You can increase (grow) or decrease (shrink) a percentage of the zCAP Reduction for the workload's LPAR. In general, when you increase the percentage of the zCAP reduction, the LPAR receives a cost reduction and when you decrease the percentage of zCAP reduction the LPAR accrues a cost increase. 

    Note

    This option is available only when the selected LPAR has zCAP Reduction activity.

  6. After entering the value, click Apply Adjustments.The MLC Planning tool applies changes to the model and performs an evaluation.
  7. When prompted to view the evaluation results, click Yes to view them, or No to continue working.

    For more information, see Viewing-the-Plan-Evaluation-Summary-Report.

    Note

    After Cost Management evaluates the model, the modified workload activity becomes the current 100% level.




 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*