Information
Limited support BMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.BMC recommends upgrading to the latest version of the product. To see documentation for that version, see LOADPLUS for DB2 13.1.

Terminating or canceling a LOADPLUS job


You can stop the LOADPLUS job in one of the following ways:

  • If you want to end the utility immediately and want the ability to restart your job, cancel the job by using the MVS or TSO CANCEL command.
  • If you want to end the job and do not intend to restart, terminate the load job by performing one of the following actions. If the job is currently running, it terminates at the next sync point.
    • Specify TERM on the restart parameter of the utility.
    • Delete the corresponding rows from the BMCUTIL, BMCSYNC, and BMCDICT tables.

 

Tip: For faster searching, add an asterisk to the end of your partial query. Example: cert*

LOADPLUS for DB2 11.2