You can add a schedule for a job when you are creating a job through the Integration Job Builder wizard, or you can add or edit a schedule later in the Atrium Integrator console using the Manage Job Schedule tool. In Atrium Integrator 8.1 and later, you can create a schedule only for the selected job. You cannot create schedule for one job and then assign it to a different job.

The UDM: Config form contains information about how many BMC Remedy AR System servers are configured in a particular server group and which Carte server is associated with each BMC Remedy AR System server.

The UDM:PermissionInfo form contains information about jobs and the associated Carte servers they run on.

To add a schedule

  1. In the Atrium Integrator console, select the job.
  2. In the Atrium Integrator console, click Manage Job Schedule   .
  3. On the Job Schedules page: 
    1. Select Active
    2. Select the Create new schedule option. 
    3. Enter a schedule name. 
    4. In Start Time, select the time (BMC Remedy AR System server time) at which you want the job to first run.
    5. In the Recurrence type area, specify how frequently you want the job to run.

      Note

      When you run reconciliation jobs, ensure that you do not run the reconciliation jobs and Atrium Integrator jobs at the same time, because the reconciliation jobs and Atrium Integrator jobs could query or update the same data.

      Job Schedules page

  4. Click Next.
    The Summary page appears.

To edit a schedule

  1. In the Atrium Integrator console, select the job.
  2. In the Atrium Integrator console, click Manage Job Schedule  .
    The Job Schedule window appears with the job name and directory displayed.
  3. Select Edit Existing Schedule
  4. Select the schedule you want to edit from the Select Schedule drop-down list.
  5. Select the Carte server on which you want to run the job.

    Note

    To run scheduled jobs if Atrium Integrator is configured in failover mode, you must select the default Carte server (ojbect NGIECarteserver)

  6. Edit the start time and recurrence type as required.
  7. Click Save.

To delete a job schedule

  1. In the Atrium Integrator console, select the job.
  2. In the Atrium Integrator console, click Manage Job Schedule.
    The Job Schedule window appears with the job name and directory displayed.
  3. Select Edit Existing Schedule
  4. Select the schedule you want to deletefrom the Select Schedule drop-down list.
  5. Click Delete.

Related topics

This version of the documentation is no longer supported. However, the documentation is available for your convenience. You will not be able to leave comments.

Comments

  1. Daniele Conigliaro

    Question: where are the Job Schedules stored? In some UDM: form? Thanks

    Aug 14, 2014 05:47
    1. Prachi Kalyani

      Hello Daniele,

      Thank you for your comment. I will verify this with the concerned SME and get back to you.

      Thanks,

      Prachi

      Aug 14, 2014 06:43
      1. Daniele Conigliaro

        Thanks Prachi, in the meanwhile I found the solution. Laurent Matheo answered me in the community. The form is "AR System Job" and the I strongly suggest to change its name, as it's too generic.

        Aug 14, 2014 07:24
        1. Prachi Kalyani

          Thank you for your comment, Daniele. I have updated the content with the links to the reference topics.

          Thanks,

          Prachi

          Aug 20, 2014 05:56
        1. Prachi Kalyani

          Hello Daniele,

          Thank you for your feedback on the form name. We have forwarded your suggestion to the product manager. You can click here to contact Customer Support to log a formal ticket for this enhancement.

          Thanks,

          Prachi

          Aug 20, 2014 05:57