Limited support

   

BMC provides limited support for this version of the product. As a result, BMC no longer accepts comments in this space. If you encounter problems with the product version or the space, contact BMC Support.

BMC recommends upgrading to the latest version of the product. To see documentation for that version, see BMC AMI Batch Optimizer (Advanced and Standard) 2.9.

Reloading Job Optimizer Pipes programs

When maintenance has been applied to Job Optimizer Pipes programs you can reload a new copy of the program without having to shut down Job Optimizer Pipes. Use this procedure to reloade Job Optimizer Pipes programs.

To reload Job Optimizer Pipes programs

Enter the following command:

F MBOP,RELOAD PGM=JOP xxxx[,SCOPE=[LOCAL|GLOBAL]]

The program name is provided by BMC.

When the reload is performed by Job Optimizer Pipes, the following message is displayed on the console:

BMC282108I JOB OPTIMIZER PIPES RELOAD JOPxxxx ENDED. RC=returnCode

Example

The following command reloads the program JOPAIO in all Job Optimizer Pipes address spaces that are working in Global mode in the sysplex:

F MBOP,RELOAD PGM=JOPAIO,SCOPE=GLOBAL


Was this page helpful? Yes No Submitting... Thank you

Comments