Controlling the SCT with Job Optimizer

The BSL STEPNUM command controls whether the Section Control Table (SCT) for a split step contains step number 1 or is updated to reflect the actual step number.

To control the SCT

Enter the following command:

mbos BSL STEPNUM [ON | OFF]

Value

Description

ON

Reflects the actual step number

OFF

Makes the step number in the SCT a 1

If you used Control-D to process SYSOUT for a split step, you must set STEPNUM to ON. BMC recommends that you place a BSL STEPNUM ON statement in your BatchPlex command member BCSCMD00.

This version of the documentation is no longer supported. However, the documentation is available for your convenience. You will not be able to leave comments.

Comments