AP installation worksheet

An activity peer (AP) is an optional server component that you install after the repository and the CDP. Before installing an AP, use the following worksheet to record information specific to your system. The installation parameters in the table correspond to the parameters in the GUI installation and the options file.

Before installing the AP, you must use Grid Manager to add this peer to a grid, as described in Adding peers.

New installation feature selection

Installation parameter

Default value and notes

Your value

Activity Peer

Activity Peer


Root Directory Selection

Installation parameter

Default value and notes

Your value

Destination directory

  • Windows:
    C:\Program Files\BMC Software\BAO\AP
  • UNIX:
    /opt/bmc/BAO/AP


Root Port Selection

Installation parameter

Default value and notes

Your value

AP

38080

AP Shutdown

38050

Click Edit Ports to edit the value for the AP Shutdown field.



Peer to CDP Communication Settings

Installation parameter

Default value and notes

Your value

CDP Protocol

https

CDP Host Name

Fully qualified domain name of the server where CDP is installed

CDP Port Number

38080

Grid Name

MyGrid

Peer's Name

AP

You must add this peer to the grid before you install it.

Advanced Options

Click Advanced Options if you want to edit the AP settings

Service Name

BAO-AP

AP Protocol

https

AP Host Name

Fully qualified domain name of the computer where you are installing the AP

Note: BMC Atrium Single Sign-On and the AP must be installed in the same domain.



AP Auto Start

Installation parameter

Default value and notes

Your value

AP Auto Start

Yes

Start the server after the installation is complete



Installation Choices Summary panel

Installation parameter

Default value and notes

Your value

Copy Text to clipboard

Before you install the activity peer successfully, you can copy the peer connection details to a clipboard for further use