AP installation worksheet
An activity peer (AP) is an optional server component that you install after the repository and the CDP. Before installing an AP, use the following worksheet to record information specific to your system. The installation parameters in the table correspond to the parameters in the GUI installation and the options file.
Before installing the AP, you must use Grid Manager to add this peer to a grid, as described in Adding peers.
New installation feature selection
Installation parameter | Default value and notes | Your value |
---|---|---|
Activity Peer | Activity Peer |
Root Directory Selection
Installation parameter | Default value and notes | Your value |
---|---|---|
Destination directory |
|
Root Port Selection
Installation parameter | Default value and notes | Your value |
---|---|---|
AP | 38080 | |
AP Shutdown | 38050 Click Edit Ports to edit the value for the AP Shutdown field. |
Peer to CDP Communication Settings
Installation parameter | Default value and notes | Your value |
---|---|---|
CDP Protocol | https | |
CDP Host Name | Fully qualified domain name of the server where CDP is installed | |
CDP Port Number | 38080 | |
Grid Name | MyGrid | |
Peer's Name | AP | |
Advanced Options | Click Advanced Options if you want to edit the AP settings | |
Service Name | BAO-AP | |
AP Protocol | https | |
AP Host Name | Fully qualified domain name of the computer where you are installing the AP |
AP Auto Start
Installation parameter | Default value and notes | Your value |
---|---|---|
AP Auto Start | Yes |
Installation Choices Summary panel
Installation parameter | Default value and notes | Your value |
---|---|---|
Copy Text to clipboard | Before you install the activity peer successfully, you can copy the peer connection details to a clipboard for further use |
Comments
Log in or register to comment.